























|
|
Track Plan and Statistics
|
Note: The enlarged track plan can be printed on a piece of paper in
landscape orientation. Make sure that all the print margins are set for
0.25" or less.
A higher resolution version of the track plan, 467 KB, is available for your viewing pleasure.
|
| Click to enlarge, 117 KB. |
| Track Statistics |
| 7½" Gauge |
3½" and 4¾" Gauges |
- 20,000+ ft of track, including 80 switches.
- Treated boiler water available at 19 locations around the track
(exclusive of the steaming bays).
- Compressed air available at 17 locations around the track (exclusive
of the steaming bays).
- Operating multiple-position signals at 105 locations (with more to
be installed).
- Two transfer tables and one turntable.
- Two hydraulic lifts.
- 42 steaming bays for 7½" gauge equipment.
- Three new 7½" gauge steaming bays under construction are under a
roof. Included will be a hoist.
|
- Silver Rails Trackplan.
- Approximately 2,050 ft. of dual gauge 3½" and 4¾" track.
- Approximately 1,320 ft. of 4¾" track, making available 3,380 ft. of track for the 1" scale and 1½" narrow gauge operators.
- 17 steaming bays with air and water, including 7 dual gauge to accommodate 3½" gauge locomotives.
- Two turntables.
- Treated boiler water available at 5 locations around the track.
- Three sidings with electrical outlets for recharging battery-powered locomotives.
- Operating signals.
|
|
Compiled by Andy Romer, PE
|
|